6-9-22: Crane lifting concrete forms
6-9-22: Crane lifting concrete forms
6-9-22: Foundation walls are nearly complete
6-9-22: Foundation walls are nearly complete
6-9-22: Crane lifting concrete forms
6-9-22: Crane lifting concrete forms
6-9-22
6-9-22
6-9-22
6-9-22
6-9-22: Storm water collection piping being installed
6-9-22: Storm water collection piping being installed
6-9-22: Staging area is filling up
6-9-22: Staging area is filling up
6-14-22: Pouring concrete on the final stretch of the foundation wall
6-14-22: Pouring concrete on the final stretch of the foundation wall
6-14-22
6-14-22
6-14-22: Piping for storm water drainage is prepped
6-14-22: Piping for storm water drainage is prepped
6-22-22: Kondex's Drill Defender HDD cobble bit is used for the directional drilling to install a new gas line
6-22-22: Kondex's Drill Defender HDD cobble bit is used for the directional drilling to install a new gas line
6-22-22: Horizontal directional drilling to install a new gas line
6-22-22: Horizontal directional drilling to install a new gas line
6-22-22: Kondex Drill Defender laser clad carbide cobble bit
6-22-22: Kondex Drill Defender laser clad carbide cobble bit
6-28-22: Loading stone for backfilling foundations
6-28-22: Loading stone for backfilling foundations
6-28-22: Manholes for the roof drainage system and storm water to be installed on the east side of the building
6-28-22: Manholes for the roof drainage system and storm water to be installed on the east side of the building
6-28-22
6-28-22
6-28-22
6-28-22
6-9-22: Crane lifting concrete forms
6-9-22: Crane lifting concrete forms
6-9-22: Foundation walls are nearly complete
6-9-22: Foundation walls are nearly complete
6-9-22: Crane lifting concrete forms
6-9-22: Crane lifting concrete forms
6-9-22
6-9-22
6-9-22
6-9-22
6-9-22: Storm water collection piping being installed
6-9-22: Storm water collection piping being installed
6-9-22: Staging area is filling up
6-9-22: Staging area is filling up
6-14-22: Pouring concrete on the final stretch of the foundation wall
6-14-22: Pouring concrete on the final stretch of the foundation wall
6-14-22
6-14-22
6-14-22: Piping for storm water drainage is prepped
6-14-22: Piping for storm water drainage is prepped
6-22-22: Kondex's Drill Defender HDD cobble bit is used for the directional drilling to install a new gas line
6-22-22: Kondex's Drill Defender HDD cobble bit is used for the directional drilling to install a new gas line
6-22-22: Horizontal directional drilling to install a new gas line
6-22-22: Horizontal directional drilling to install a new gas line
6-22-22: Kondex Drill Defender laser clad carbide cobble bit
6-22-22: Kondex Drill Defender laser clad carbide cobble bit
6-28-22: Loading stone for backfilling foundations
6-28-22: Loading stone for backfilling foundations
6-28-22: Manholes for the roof drainage system and storm water to be installed on the east side of the building
6-28-22: Manholes for the roof drainage system and storm water to be installed on the east side of the building
6-28-22
6-28-22
6-28-22
6-28-22