8-4-22: Masonry work is underway for the new plant restrooms
8-4-22: Masonry work is underway for the new plant restrooms
8-4-22: It's a busy construction site with multiple contractors on site
8-4-22: It's a busy construction site with multiple contractors on site
8-4-22: Only a few south wall panels left to move
8-4-22: Only a few south wall panels left to move
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: Plumbing crews install storm drain piping
8-4-22: Plumbing crews install storm drain piping
8-4-22: New plant restrooms underway
8-4-22: New plant restrooms underway
8-4-22: Roofing installation is in full swing
8-4-22: Roofing installation is in full swing
8-4-22: Rooftop views of structural steel welding
8-4-22: Rooftop views of structural steel welding
8-4-22: Audio communications guide the crane operator in delivering materials to crews
8-4-22: Audio communications guide the crane operator in delivering materials to crews
8-10-22: Precast panels are delivered and unloaded for the east side of our building
8-10-22: Precast panels are delivered and unloaded for the east side of our building
8-10-22: Crane lifting the east facing wall panels into place
8-10-22: Crane lifting the east facing wall panels into place
8-10-22: Installing the east facing wall panels
8-10-22: Installing the east facing wall panels
8-10-22: Installing the east facing wall panels
8-10-22: Installing the east facing wall panels
8-23-22: Wall panels have been mostly complete for about two weeks, with the exception of an opening allow for future cement truck access
8-23-22: Wall panels have been mostly complete for about two weeks, with the exception of an opening allow for future cement truck access
8-23-22: Mechanical work continues inside the expansion
8-23-22: Mechanical work continues inside the expansion
8-23-22: Prefabricated rails and stairs await their future home
8-23-22: Prefabricated rails and stairs await their future home
8-30-22: HVAC ductwork is being installed
8-30-22: HVAC ductwork is being installed
8-30-22: HVAC ductwork is ready to be installed
8-30-22: HVAC ductwork is ready to be installed
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-4-22: Masonry work is underway for the new plant restrooms
8-4-22: Masonry work is underway for the new plant restrooms
8-4-22: It's a busy construction site with multiple contractors on site
8-4-22: It's a busy construction site with multiple contractors on site
8-4-22: Only a few south wall panels left to move
8-4-22: Only a few south wall panels left to move
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: An existing wall panel is relocated to the expansion south wall
8-4-22: Plumbing crews install storm drain piping
8-4-22: Plumbing crews install storm drain piping
8-4-22: New plant restrooms underway
8-4-22: New plant restrooms underway
8-4-22: Roofing installation is in full swing
8-4-22: Roofing installation is in full swing
8-4-22: Rooftop views of structural steel welding
8-4-22: Rooftop views of structural steel welding
8-4-22: Audio communications guide the crane operator in delivering materials to crews
8-4-22: Audio communications guide the crane operator in delivering materials to crews
8-10-22: Precast panels are delivered and unloaded for the east side of our building
8-10-22: Precast panels are delivered and unloaded for the east side of our building
8-10-22: Crane lifting the east facing wall panels into place
8-10-22: Crane lifting the east facing wall panels into place
8-10-22: Installing the east facing wall panels
8-10-22: Installing the east facing wall panels
8-10-22: Installing the east facing wall panels
8-10-22: Installing the east facing wall panels
8-23-22: Wall panels have been mostly complete for about two weeks, with the exception of an opening allow for future cement truck access
8-23-22: Wall panels have been mostly complete for about two weeks, with the exception of an opening allow for future cement truck access
8-23-22: Mechanical work continues inside the expansion
8-23-22: Mechanical work continues inside the expansion
8-23-22: Prefabricated rails and stairs await their future home
8-23-22: Prefabricated rails and stairs await their future home
8-30-22: HVAC ductwork is being installed
8-30-22: HVAC ductwork is being installed
8-30-22: HVAC ductwork is ready to be installed
8-30-22: HVAC ductwork is ready to be installed
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom
8-31-22: Pouring concrete in the new plant restroom